Moving from Classic to Next
Guide & FAQs
37 articles
- What is the Site Health Report?
- What happens if my Site Health Report and migration handover report show different items?
- What do I do once my Site Health Report is cleared (no outstanding Must Fix items)?
- What should you do if a fixed item still appears on the Site Health Report?
- How do I submit my site health check report and request a launch date?
- What should I do if support has flagged information-architecture or user-experience issues with my site?
- How do I edit navigation bar or footer label text?
- Do table blocks need a caption?
- What do I do about missing alt text?
- Who is responsible for fixing an "All page content must be within marked landmarks or regions" issue flagged on the Site Health Report?
- What causes a broken-link "Must Fix" issue on the Site Health Report for a navigation bar link?
- What happens after Isomer bulk-fixes Must-Fix items on my site?
- Can I opt out of Isomer's bulk-fix changes and fix Must-Fix items myself?
- What is "Expected Cutover Domain" on the Site Launch Checklist?
- What should you do if your Oobee accessibility scan is failing during site launch preparation?
- When does the downtime happen during an Isomer Next cutover?
- Do I need to be on standby during my site's cutover?
- What happens if a visitor tries to access my site during the cutover downtime window?
- Why do I need to set a WOGAA maintenance window before my Isomer Next cutover?
- What is Isomer's launch cadence and lead time?
- Can I rely on the 2-3 week lead time for a guaranteed launch date?
- How do I reschedule or postpone my launch?
- What do I do when I receive the "Confirming your Isomer Next launch date" email?
- What do I do when I receive the "Quick check-in ahead of launch" email?